Managing and planning: MOTS and COTS EMC for the MoD

Managing and planning: MOTS and COTS EMC for the MoD

By Peter Dorey, Senior EMC Consultant, TÜV Product Service Ltd
Published: December 2007 - Defence Contracts Bulletin

Defence contractors intending to supply military off-the-shelf or commercial off-the-shelf electrical or electronic equipment for use on military platforms, or to integrate them into systems, now have new guidance on a risk assessment process for achieving electromagnetic compatability. Pete Dorey, senior EMC consultant at TÜV Product Service and one of the lead authors of the new UK MoD Standard 59-411 for electromagnetic compatibility, explains the guidance contained in Part 1 of the Standard.

One of the difficulties with integrating military off-the-shelf (MOTS) and
commercial off-the-shelf (COTS) products into complex military systems is
achieving electromagnetic compatibility (EMC).

EMC is the ability of electrical and electronic equipments and systems to share the electromagnetic spectrum and perform their desired functions without unacceptable degradation from or to the electromagnetic environment.

The MOTS acronym is used to describe both military off-the-shelf and modified
off-the-shelf equipment: military off-the-shelf equipment is qualified to a non-UK
EMC Standard, such as the US Standard MIL-STD-461. Modfied off-the-shelf
equipment is a COTS product that has modifications to enhance its EMC performance.

COTS products are proprietary and meet the EMC performance requirements of the EU Directive for EMC, 2004/108/EC, and carry CE Marking that allows their free trade across EU Member States.

The incorporation of MOTS and COTS equipment into defence systems and
platforms often requires electromagnetic barriers – such as shielded racks and filters and the use of fibre-optics. These measures reduce susceptibility to harsh defence electromagnetic environments and also enhance compatibility with sensitive colocated systems such as military radio.

In order to assess the degree of protection required (or indeed if any is required),
the risk assessment process of Def Stan 59-411 can be used to compare the existing EMC compliance of the MOTS/COTS equipment to the defence EMC requirement.

The UK EMC Standard for defence procurement, Def Stan 59-411, includes
a risk assessment approach in its Part 1 ‘Management and Planning’ for MOTS/COTS equipment, as shown below.

risk-diagram.jpg

The process requires the intended electromagnetic environment to be defined, the evidence of EMC compliance to be evaluated, the functional criticality of the
equipment and platform to be determined and, finally, the mitigation of unacceptable risks either by carrying out remedial redesign, installation methods such as electromagnetic barriers and/or retesting.

The target electromagnetic environment is usually specified in the User
Requirement Document (URD) or System Requirement Document (SRD). It may be specified for a unique purpose, or it may be one of the generic electromagnetic environments encompassed by the default test requirements of Def Stan 59-411 (for example a ship below decks environment). Once the environment definition is known, the adequacy of the MOTS/COTS EMC performance can be evaluated.

Obtaining the evidence of EMC compliance is one of the major challenges of
the risk assessment process. All MOTS/COTS items of equipment must carry CE Marking, which, currently, may indicate that the manufacturer or supplier declared conformity with the earlier EU EMC Directive 89/336/EEC for apparatus placed on the market up until 20 July 2007, or has declared conformity with the current EU EMC Directive 2004/108/EC for apparatus placed on the market since 20 July 2007.

In both cases the requirement for CE Marking does not apply if the apparatus
is military equipment exempted under Article 296 of the Treaty of the European
Community (TEC).

For equipment already placed on the market prior to 20 July 2007, the existing
declaration of compliance with 89/336/EEC remains valid for a two-year transition period until 20 July 2009. After this date, all equipment must comply with 2004/108/EC.

The manufacturer or supplier prepares a Declaration of Conformity (DoC)
identifying the EMC standards to which the equipment is compliant. The DoC may be with the equipment documentation, on the manufacturers' website, or supplied on request.

Under the current EMC Directive 2004/108/EC, the manufacturer or supplier must maintain ‘Technical Documentation’ containing an EMC assessment such as a Test Report and design information. Ideally, a copy of the EMC Test Report or Test Certificate should be obtained to confirm the actual tests undertaken and the limits applied.

Having identified the EMC standards applied to the MOTS/COTS equipment, a ‘gap analysis’ is performed to evaluate the EMC compliance evidence of the MOTS/COTS equipment against the EMC test requirements of Def Stan 59-411.
In order to compare test compliance evidence for MOTS/COTS equipment against Def Stan 59-411, differences in the test methods and limits must be identified and accounted for in the comparison. These include ports tested, frequency range, limit levels, emission test detector type, test bandwidth, test distance, susceptibility test modulation and coupling method. Due to the multitude of commercial standards used today, there is the possibility of numerous comparisons and, therefore, gap analysis tools have been developed to assist in this process.

The gap analysis determines whether the MOTS/COTS standard test is more or less stringent than the Def Stan 59-411 test limit and the margin applicable. It also identifies the frequency range addressed by the commercial standard to allow a user to identify untested frequency bands. Based on this information a user can determine the risk of deploying a piece of equipment meeting the MOTS/COTS standard in an environment represented by Def Stan 59-411, or can identify the degree of additional protection required to meet Def Stan 59-411 in terms of barrier performance shielding attenuation and filter attenuation.

The risks identified from the evaluation of the MOTS/COTS EMC compliance
evidence in the previous process must now be compared to the criticality of the
MOTS/COTS equipment and the criticality of the environment or platform in which the COTS/MOTS equipment will be operated. Generally, the greater the criticality of the MOTS/COTS equipment, the lower the risk of susceptibility is permitted. The greater the criticality of the environment or platform, the lower the risk of emission is permitted.

Once the project has determined the unacceptable risks, they are mitigated as follows – there are two options:

  1. Retest the MOTS/COTS equipment to determine compliance with
    Def Stan 59-411. This is technically a good approach as any subsequent required protection can be properly specified and over-protection will be avoided. However, the disadvantage of this approach is the cost implications of the additional testing required;
  2. Remedial redesign can be achieved by adding the appropriate protection ‘barriers’ to reduce the coupled radio frequency (RF) fields or currents the equipment could be exposed to or could emit to below the levels it was originally required to meet. Many manufacturers now offer suitable RF shielded racks and enclosures for this purpose. These allow the MOTS/COTS equipment to be housed without modification such that line replacement is readily achieved. The gap analysis process provides the barrier performance specification required. Where a piece of modified MOTS/COTS equipment becomes modified off-the-shelf equipment marketed as a variant or a new model, the resulting equipment needs to meet the EMC Directive with CE Marking as a ‘new apparatus’ in its own right. The manufacturer or supplier of military equipment – whether bespoke, MOTS or COTS – needs to comply with those applicable UK regulations that implement EU Directives, including the EU EMC Directive.

The current UK EMC regulations (SI 2006 No3418) implementing EMC Directive
2004/108/EC do not have a specific exemption for military equipment, whereas
the previous regulations did include such an exemption (SI 2005 No281). In addition, the European Commission is re-examining Article 296 of the TEC – the so-called 'military exemption'. The expected outcome is that defence procurement contracts will require compliance with all applicable EU Directives, unless a specific exemption is granted under Article 296 of the TEC on a case-by-case basis, due to essential national security interests. The existing perception by manufacturers was that a 'blanket’ exemption applies to military equipment. This is not correct and, therefore, manufacturers need to re-examine their contracts and apply CE Marking unless specifically exempted.

Applying the EMC Directives to defence projects could lead to the duplication of
compliance testing – once for Def Stan 59-411 and once for CE Marking – and incur additional costs.

However, testing can be minimised by establishing within the Technical
Documentation the equivalence between Def Stan 59-411 and commercial standards, using the gap analysis process described above. Note that the process can be used in either direction: to show equivalence of commercial standards to Def Stan 59-411 or to show equivalence of Def Stan 59-411 to commercial standards. Note, however, that the generally held perception that Def Stan 59-411 satisfies the majority of the EMC Directive requirements is not always true, as shown by examples of the gap analysis process already performed. Unsatisfied requirements need to be addressed by testing in accordance with commercial standards.

Once the Technical Documentation is established, demonstrating compliance with the EMC Directive and the associated commercial standards, the manufacturer or supplier then makes a Declaration of Conformity and applies CE Marking. What assistance is available in this process? Third-party certification of the technical documentation is no longer mandatory, and the current EMC Directive has replaced ‘Competent Bodies’ with ‘Notified Bodies’ whose involvement in assessing the technical documentation is optional. However, due to the complexity of performing gap analysis, a Notified Body provides a low-risk solution.